
| 66 Waterloo Road - North Ryde Worked with builder (St Hilliers) from D & C concept through construction; then worked with owner (Stocklands) to get original 4.5 target, and then improved to 5 star NABERS with zero green power within 18 months of occupation! The building has maintained it’s 5 star NABERS energy performance rating for four consecutive years to date, one of the first buildings in Australia to do so |
| 40 Cameron Ave - Belconnen, ACT Development and overview of strategic upgrade plan to improve NABERS Energy rating for existing building by improving energy efficiency by 50% by 2012; successful application for Green Building Fund. A complete upgrade of all HVAC and lighting services is ongoing. |
| Integral Energy - Huntingwood Building Energy Efficiency Review, analysed upgrade options and provided preliminary budgets |
|
DOCS - 309 Charlestown Road – Charlestown Energy Modeling; ESD Concept Design |
|
55 Elizabeth St - Brisbane, QLD NABERS Independent Design Review for Grocon's development in Brisbane |
|
AMEX Building – King Street Wharf NABERS Review; Energy Modeling |
|
QUAD 4 NABERS Independent Design Review |
|
175 Castlereagh St, 9 Castlereagh St, 222 Pitt St -
Sydney Design and overview for successful upgrade of chilled water plant including chiller replacements and associated chiller HLI integration with at each site to improve NABERS rating and part load operation. The chiller upgrade at 175 Castlereagh St has been completed, and the building performance has improved to a targeted 4.5 NABERS Energy star |
|
99 Elizabeth St - Sydney Advisory role in development of a “deep refurbishment” for an inner city 14 storey commercial office building. Team Catalyst is advising on glazing selection, HVAC sizing and configuration, carrying out building energy simulation, review and monitor performance after construction to achieve a targeted NABERS Energy rating |
|
60 Station St, Parramatta Team Catalyst has a comprehensive review role to help John Holland manage risks towards achieving a 5 star NABERS performance rating within 18 months after construction and tenant occupation for a new 25,000 m2 commercial office tower building. Team Catalyst provided a concept design evaluation in 2008, with particular emphasis to glazing and mechanical system configuration. |
|
Brookfield Place (125 St George Terrace) – Perth (WA) Revised central chilled water plant concept to minimize NABERS Energy risk for a 45 storey, 70,000 m2 commercial building, and developed energy simulation models to predict NABERS operation and GreenStar credits |
|
Ponds Creek ESD Concept Design; Energy Modeling using mixed mode systems; NABERS/Green Star Review |
|
YHA – The Rocks ESD Concepts/ Energy Modeling; DA compliance required fulfillment of Team Catalyst ESD report. The building has been completed and has won 19 awards to date, including the AIA and PCA sustainable building awards |
|
Macquarie University – Bldg. C3C (Library) Energy Simulation – Green Star review; working with the University, AW Edwards and GBCA to assist in development of alternate GHG calculation method by developing a reference and proposed design HVAC system method that was proposed and accepted by the GBCA |
|
Northbridge (Santos Place) – 32 Talbot Street
Brisbane Energy Simulation Model; ESD Peer review; project has a 800 kW tri-generation system with absorption chillers and electric generators combined with a conventional electric HVAC system. The building has since achieved it's NABERS Commitment Agreement rating |
|
39 Hunter Street - Sydney NABERS Independent Design Review |
|
Transport House – Sydney NABERS Independent Design Review |
|
University of NSW College of Fine Arts (COFA) ESD Review; Master Planning input |
|
top - profile
- services - links - contact
- home
All original content copyright Team Catalyst © TeamCatalyst.com.au |